Tidal power plant in Canada

Reconcept is the owner of project rights for two river hydropower plants in the Canadian province British Columbia.The installed capacity of the projects is 15 megawatts (MW) - 6.4 MW and 8.5 MW each.

The two reconcept projects are currently undergoing final development work. The projects are being developed by reconcept and a local Canadian partner with many years of hydropower expertise.

Fact and figures

  • Location
    near Kitimat, British Columbia, Canada
  • Total output
    15 MW
  • Project size
    2 run-of-river power plants
  • Commissioning
    2023 planned
  • Turbine type
    2 x Pelton
  • Catchment area for inflow
    32.2 km²
  • Flow rate | head
    Bowbyes Creek: 3.15 m³/s | 249.9 m
    Dahl Creek: 6.2 m³/s | 176.8 m
  • Annual yield
    Bowbyes Creek: 15.86 GWh (P 50); Dahl Creek: 24.33 GWh (P 50)


    Planning status: January 2022
var _mtm = window._mtm = window._mtm || []; _mtm.push({'mtm.startTime': (new Date().getTime()), 'event': 'mtm.Start'}); var d=document, g=d.createElement('script'), s=d.getElementsByTagName('script')[0]; g.type='text/javascript'; g.async=true; g.src='https://stats.reconcept.de/js/container_LeTowWx8.js'; s.parentNode.insertBefore(g,s);